SAMPLE
Piping Toolset — Calculation Report
generated by calc-core · 2026-07-21
ProjectSample Project — Demonstration Only Job No.SAMPLE-001 Client
CalculationDead-Leg L/d Ratio Calculator (ASME BPE) Calc byPiping Toolset (calc-core) Checked byUNCHECKED — sample
Date2026-07-21 Rev0 BasisASME BPE SD-3.1.2.2 (L/d target 2)

1 · Design inputs

Instrument tee off a hygienic process line: dead-leg length 50 mm, branch ID 25 mm, standard limit of 2.

Dead-leg length L50mm
Branch ID d25mm
Limit2

2 · Method

L/d ≤ 2   (target, ASME BPE SD-3.1.2.2)

L is the dead-leg length measured from the ID wall of the run (or the wetted flow path) to the end of the branch — including the valve body up to the seat — and d is the branch inside diameter. Units cancel; mm and inches both work as long as both entries match. Branches at or under 0.5 in draw a small-branch advisory: at small diameters, absolute length and drainability matter more than the ratio.

3 · Calculation

  1. L/d = 50 / 25 = 2.0.
  2. Margin = 2 − 2.0 = 0.0 → exactly at the target: PASS.

4 · Results PASS

L/d ratio2.0
Margin0.0
VerdictPASS

5 · Verification statement

The result values above are locked as fixture dead-leg.json, case “at the limit -> pass”, tolerance 1e-9, in the calc-core continuous verification gate (see https://pipingtoolset.com/trust/validation.html). Allowable-stress and factor data are user-supplied inputs; citations: ASME BPE — SD-3.1.2.2, dead-leg L/d design target (embedded limit under ASME authorization).

SAMPLE REPORT — auto-generated from a verification fixture to show the report format. Not a project calculation. ⚠ Engineering-aid tool. Public code equations; allowable-stress and factor data are user-supplied. Results MUST be independently verified and reviewed by a qualified/licensed engineer before any design, fabrication, or operation decision.