| ProjectSample Project — Demonstration Only | Job No.SAMPLE-001 | Client— |
| CalculationHygienic Line Slope / GSD Drainability Calculator (ASME BPE) | Calc byPiping Toolset (calc-core) | Checked byUNCHECKED — sample |
| Date2026-07-21 | Rev0 | BasisASME BPE SD-2.4.3 GSD designations |
A transfer line installed at 1 in of fall over 192 in of run (16 ft), drawing calls GSD1.
| Rise | 1 | in |
| Run | 192 | in |
| Target | GSD1 | — |
slope ratio = rise / run → in/ft, mm/m, %, degrees
The computed slope is compared against the GSD (Gravity Slope Designation) minimums of ASME BPE SD-2.4.3 (GSD1 = 1/16 in/ft, GSD2 = 1/8 in/ft, …). The card reports the highest designation the slope satisfies and the margin to your target designation. The companion Slope Drainability Report card packages the same check as a per-segment classification report.
| Slope | 0.0625 (1/16) | in/ft |
| Equivalent | 5.208 | mm/m |
| Highest GSD met | GSD1 | — |
| Verdict | PASS | — |
The result values above are locked as fixture slope-check.json, case
“1:192 (1/16 in/ft) meets GSD1 exactly -> pass”, tolerance 0.00001, in the calc-core continuous
verification gate (see https://pipingtoolset.com/trust/validation.html). Allowable-stress and factor data are
user-supplied inputs; citations: ASME BPE — SD-2.4.3, gravity slope designations (GSD) for drainability (embedded under ASME authorization).