Game math is simplified. Not for design. The engineer of record verifies.

Notes and sources
  • Every dollar figure, wear rate and severity is an assumed game number, not an estimate.
  • No code-table values and no calculations from any standard are in this page. Cards cite the paragraph and name the calculator.
  • Editions: B31.1-2026, B31.3-2024, B31.9-2025, B31J-2023, PCC-1-2022, MSS SP-58-2025, API Std 521 7th Ed., API RP 686 2nd Ed., ASCE 7-22.
  • Pump puzzle: API RP 686 2nd Ed., Chapter 6 covers the gauge taps, the temporary strainer, the check valve ahead of the discharge block valve, and the eccentric reducer flat side up. Strainer after the suction block valve and bypass take-off ahead of the check valve are common practice, not from the RP. Symbols are plain boxes.
  • Spring hanger puzzle: MSS SP-58-2025 wants hangers installed, adjusted and loaded before the hydrotest, with the stops in, and the stops out afterward.
  • Material names are shop names. Specs and grades are as listed in ASME B31.3-2024 Table A-1; "ERW" for A53 Type E comes from the ASTM spec itself.
  • Tie rod puzzle paraphrases the Proco Products 2013 installation manual for Style 240/242.

PipingToolset · Flexible Piping Solutions LLC